New Construction Cleaning in St. George, UT

New construction cleaning for home builders in St. George, UT and across Washington County, Iron County and Beaver: a rough clean before appliances and carpet go in, and a final clean before the walkthrough.

New Construction Cleaning

Why Southern Utah Builders Use Us

Most of our new construction cleaning is for builders and general contractors who need homes clean for the walkthrough and closing. We also clean for homeowners moving into a new build and for office buildings finishing construction, across St. George, Hurricane, Cedar City and the rest of Southern Utah.

Service

Rough clean + final clean

Built for

Builders & contractors

Also for

Homeowners & office buildings

Price

$0.38 per sq. ft.

Interior windows included

One price covers both cleans.

What’s Included

Two Stages, One Clean Home

Every new construction clean, sometimes called post construction cleaning, has two visits. The rough clean happens before appliances and carpet go in; the final clean details the finished home before the walkthrough.

Rough Clean: Before Appliances and Carpet

01

Walls, Doors and Hardware

Dry mop and wipe walls, doors and baseboards; clean hinges, hardware and outlet covers.

02

Tape, Blocks and Debris

Remove painter blocks, tape and loose construction debris, and sweep up larger debris.

03

Cabinets, Tubs and Floors

Vacuum cabinets, shelving, countertops, tubs, floors, baseboards and window sills.

04

Interior Windows

Clean interior window glass, frames, tracks and sills, opening windows to reach the sills and wipe window wells.

05

Garage

Wipe the garage walls and blow out the garage.

Final Clean: Ready for the Walkthrough

06

Countertops and Cabinets

Remove countertop protective plastic and detail cabinet interiors, exteriors, undersides and accessible piping.

07

Fixtures, Glass and Mirrors

Clean light fixtures, glass and mirrors, dust shelving and wipe appliance exteriors.

08

Counters, Sinks and Faucets

Clean and shine countertops, sinks and faucets.

09

Toilets, Showers and Tubs

Clean toilets top to bottom, including sides and exposed piping, and detail showers, tubs, tile, hardware and shelving.

10

Floors and Baseboards

Vacuum floors and baseboards, then mop floors for a streak-free finish.

11

Paint, Thresholds, Garage and Porch

Remove paint residue, clean door thresholds, and blow out the garage and porch.

Scope

What's Included and What's Quoted Separately

Included

Quoted Separately

How It Works

How New Construction Cleaning Works, From Quote to Keys

01

Request a Quote

Fill out the short form with your project details, square footage and the date you need it cleaned.

02

Jessica Calls You

Jessica calls to confirm the scope, answer your questions and give you a price.

03

We Schedule the Clean

We book the rough clean and final clean around your build schedule, walkthroughs and closing date.

04

Ready for the Walkthrough

The home is clean top to bottom and ready for the builder walkthrough, closing and move-in.

Finished Work

New Homes, Ready for Move-In

A few of the new builds and model homes we have cleaned in Southern Utah.

Kitchen

Final clean

Primary Bathroom

Final clean

Model Home

Walkthrough-ready

Service Area

Areas We Serve

Based in La Verkin, we clean new builds, job sites, homes and businesses across all of Washington County, parts of Iron County and north as far as Beaver.

St. George, UT

Washington, UT

Santa Clara, UT

Ivins, UT

Hurricane, UT

Leeds, UT

Virgin, UT

Springdale, UT

Toquerville, UT

La Verkin, UT

Cedar City, UT

Beaver, UT

FAQ

New Construction Cleaning Questions

Answers to the questions builders and homeowners ask most. Call us if you do not see yours.

What does a rough clean include?

The rough clean removes construction dust and debris before the final detailing visit. We dry mop and wipe walls, doors and baseboards, clean hinges, hardware and outlet covers, remove painter blocks and tape, vacuum cabinets, shelving, countertops, tubs and floors, clean interior windows, and wipe and blow out the garage.

The final clean prepares the finished home for move-in. We remove countertop plastic, detail cabinets inside and out, clean fixtures, glass and mirrors, shine countertops, sinks and faucets, detail toilets, showers and tubs, vacuum and mop floors, remove paint residue, and clean thresholds, the garage and the porch.

New construction cleaning is $0.38 per square foot for the rough and final cleans combined, with interior windows included. Final quotes depend on square footage, scope and site conditions.

Yes, up to 30 minutes of paint removal is included. Additional time is billed at $30 per hour.

Exterior windows are quoted separately. Interior windows are always included in new construction cleaning.

Additional visits are quoted separately, so you only pay for the extra trips you need. Call (435) 215-9655 and we will get it scheduled.

Building in Southern Utah? Let’s Get Your Homes Ready.

Send us your project details and Jessica will call you to confirm the scope, schedule and price.

Other Services

More Cleaning Services From Housley

Job-Site Cleanup

General cleanup during the construction process: trash and loose debris removed, surfaces dusted, floors swept and the site kept tidy as needed.

Commercial Construction Cleanup

Rough and final cleanup for commercial construction projects. We remove dust and debris, wipe surfaces and equipment, and vacuum and mop floors.

Remodel Cleanup

Cleaning before and after renovation work. Before: surfaces wiped and vacuumed. After: renovation dust removed, kitchens and bathrooms detailed, floors and interior windows cleaned.

Move-Out Cleaning

Detailed cleaning of an empty home after belongings are out: kitchens, bathrooms, doors, trim, baseboards and floors. Cabinet, appliance and window cleaning are confirmed in your scope.

Deep Cleaning

A thorough clean focused on buildup and the areas that need extra attention, from kitchen and bathroom fixtures to high-touch surfaces, trim and floors.